Newly-constructed Vietnamese National Assembly House
Tuesday, 07/10/2014 06:42 (GMT+7)
On October 3, Prime Minister Nguyen Tang Dung made a working visit to the new National Assembly (NA) House to assess the progress on construction. The Prime Minister concluded that the unique building is of modern design and high-tech infrastructure that represents the largest construction of its kind since reunification in 1975.
|
The NA House, situated on Doc Lap road in Ba Dinh district, is 39 meters high with a total ground area of 60,000 square meters. |
|
From the lobby to the House |
|
The first floor with spacious lobby |
|
Seen from the first floor, the green dome is the main meeting room of the House. |
|
Corridors are alike in each floor. |
|
The 100-seat press conference room. |
|
The meeting room of the NA Standing Committee with a system of 6 screens to help deputies easily follow the meeting. |
|
This room will be used to hold the October session of the NA Standing Committee. |
|
Electronic devices are imported from foreign countries. |
|
The 2-floor hall has been well equipped. |
|
Final details are being completed. |
|
Tables in the hall are domestically produced. |
|
The main hall |
|
Prime Minister Nguyen Tan Dung in his inspection trip of the House project. |